5/18/2016 - Asbestos Surveys - What you should Know
Posted in Unspecified

 

Involving the 1950s as well as the 1980s, asbestos was adopted in many premises, particularly for fire proofing. - Air monitoring perth 

It isn't really used anymore because once it is disturbed, asbestos releases airborne fibres that may cause serious diseases. However, asbestos might still be present in any building built before 2000.

Asbestos surveys

Under the Control of Asbestos in the Workplace Act of 2004, it does not take responsibility from the duty holder of any non-domestic building to control asbestos. As a way to manage asbestos adequately, the work holder needs to ascertain whether and where asbestos is found which is where asbestos surveys appear in.

A survey will:

� Find and record the location of asbestos-containing materials (ACM), and also just how much asbestos occurs

� Assess and record how easy to get at the ACM is along with what condition it is in

� Record what sort of asbestos occurs, usually through taking samples

There are two main types of asbestos survey: the management survey as well as the refurbishment/demolition survey.

Management asbestos surveys

Management surveys are meant to identify and manage asbestos-containing materials (ACM) which are a risk in the day-to-day occupation of the commercial building. A surveyor can help you carry out this sort of survey.

The purpose of an administration asbestos survey would be to ensure that:

� ACM within machinery or even the premises will not harm the occupants because they attempt their daily business

� ACM will be in good repair

� ACM will never be disturbed, either intentionally or unintentionally

The survey will identify ACM that could easily be damaged or disturbed through routine workplace activities. A qualification of minor asbestos disturbance will be required so that a Materials Assessment can be achieved. This helps the surveyor to determine how fibres are let go and permits them to create an asbestos management plan and suggest any remedial work that could be required.

Refurbishment/demolition asbestos surveys This sort of survey will be required whenever any refurbishment or demolition tasks are planned within the building.

The objective of a refurbishment/demolition survey is:

� To ensure that the renovation work won't damage or disturb any ACM

� To make sure that the task will be performed by the contractor who understands the asbestos risks. Laptop computer will identify where ACM can be obtained from the premises (before any refurbishment or demolition work begins). Some asbestos disturbance is needed and staff must not be in the region in the survey. They're able to only return as soon as the area continues to be deemed safe by the surveyor. - Air monitoring perth 

An experienced and qualified surveyor will perform these asbestos surveys so that you can help you make sure you always meet your duty to control asbestos.